341 Job openings found

1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
3.50 LPA TO 3.50 LPA
JOB DESCRIPTION   17.02.26 126664 HPS/2026/141 QC Engineer Male 1 2 to 3 DME/B.E-Mech 8 Hours A Quality Control (QC) Engineer ensures that products, materials, or construction projects meet strict quality standards and specifications. They design inspection procedures, test products. Key Responsibilities and Duties- Inspection and Testing: Conduct, analyze, and document tests on raw materials, components, and finished products to ensure conformity with specifications. Process Improvement: Monitor ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.40 LPA
JOB DESCRIPTION 16.01.26 123881 HPS/2026/52 Purchase Executive/Chemical Engineer Male 1 2 to 3 Diploma/B.E Chemical 8 Hrs A Purchase Executive/Chemical Engineer manages sourcing, procurement, and supplier relations for chemical materials, requiring strong negotiation, market knowledge, and technical understanding (chemical/engineering) to ensure quality, cost-effectiveness, and timely delivery for production Key Responsibilities: Procurement & Sourcing: Identify, research, and pre-qualify potential chemical suppliers, creating bidder lists. Vendor Management: Build ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 3.60 LPA
  04.12.25 121436 HPS/2025/618 QC Engineer Male 1 2 to 5 DME/ITI/B.E-Mechanical 8 Hours GET - QUALITY CHECKER  Develop and maintain a quality management system to achieve qualityobjectives and ensure customer satisfaction. Prepare, revise, and upgrade quality plans, including inspectionprocedures, in accordance with process reliability, stability, and clientexpectations. Implement a robust QA and QC plan and mechanism across the entireoperation ...
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
  30.07.25 113836 HPS/2025/447 Production Engineer Male 2 1 to 3 DME / B.E (Mech) 8 Hours Planning and Scheduling: Production engineers develop and manage production schedules, ensuring efficient use of resources and timely delivery of products.    Process Improvement: They analyze existing production processes, identify areas for improvement, and implement changes to enhance efficiency, reduce costs, and minimize waste.    Quality Control: Production engineers establish and ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.44 LPA TO 1.80 LPA
15.04.25 111836 HPS/2025/285 Production Engineer Male 1 1 to 3 DCE/BE Chemical 8 Hours Process Optimization: Analyze existing processes to identify areas for improvement, implement changes to enhance efficiency, and reduce costs.   Production Planning: Develop and implement production plans, schedules, and procedures to meet production targets and deadlines.   Equipment Management: Ensure that production equipment and machinery are functioning properly, and implement preventative maintenance and ...
1 Opening(s)
0 To 2.0 Year(s)
1.80 LPA TO 2.40 LPA
26.03.25   HPS/2025/222 QC Engineer Male 3 0 to 1 Graduation GET - QUALITY CHECKER  Develop and maintain a quality management system to achieve qualityobjectives and ensure customer satisfaction. Prepare, revise, and upgrade quality plans, including inspectionprocedures, in accordance with process reliability, stability, and clientexpectations. Implement a robust QA and QC plan and mechanism across the entireoperation to ...
2 Opening(s)
4.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.60 LPA
13-03-25   HPS/2025/164 Planning Engineer Male 2 4 to 5 BE.Mech/DE   Planning and Scheduling: Develop detailed project plans, schedules, and timelines using tools like Gantt charts and critical path analysis.    Resource Management: Optimize resource allocation (manpower, equipment, materials) to maximize efficiency and minimize costs.    Risk Management: Identify potential risks and develop mitigation strategies to minimize project disruptions.    Progress Monitoring: Track project progress against the schedule ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
13-03-25   HPS/2025/163 Production Engineer Male 2 4 to 5 BE.Mech/DE Process Optimization: Analyze existing processes to identify areas for improvement, implement changes to enhance efficiency, and reduce costs.    Production Planning: Develop and implement production plans, schedules, and procedures to meet production targets and deadlines.    Equipment Management: Ensure that production equipment and machinery are functioning properly, and implement preventative maintenance and repair plans.    Quality ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 10.00 LPA
13-03-25   HPS/2025/160 Mechanical Maintainence Engineer Male 1 10 to 12 BE.Mech/DE Equipment Maintenance: Ensuring the smooth and efficient operation of machinery and equipment through regular maintenance, repairs, and upgrades.    Problem Solving: Diagnosing mechanical issues, identifying root causes, and developing effective solutions for repairs or replacements.    Preventive Maintenance: Implementing and managing preventative maintenance programs to minimize downtime and extend equipment lifespan.    Safety Compliance: Ensuring adherence ...
7 Opening(s)
2.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 2.40 LPA
  Role - Trainee Engineer   Functional Area Production, Manufacturing, Maintenance   11.11.24   HPS/2024/695 Trainee Engineer Male 1 2 to 3 DME/B.E Mech/ITI Fitter Employment Type -Full Time     Education -B.E (Mechanical)/ Diploma (Mechanical )/ITI Fitter   Salary Range - 15000 To 20000   Exp - 2 to 3   Duty Hours - 12 Hrs   Other Facilities - Accomadation & Food PF bones    

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile