1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 4.80 LPA
11-03-25
HPS/2025/146
Sr. Production Merchandisor
Male
1
3 to 5
DTE
Order Management:
Coordinating with buyers, suppliers, and internal teams to execute export orders, from costing and order placement to final shipment.
Production Planning:
Developing production plans, ensuring timely delivery and meeting quality standards.
Sourcing & Purchasing:
Selecting suppliers, sourcing materials (fabrics, trims, etc.), and purchasing accessories.
Communication:
Maintaining clear and effective communication with ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
4.00 LPA TO 5.00 LPA
Job description
06.12.24
HPS/2024/766
Product Assist Manager
Male
1
2 to 4
B.E Mech
JOB SUMMARY
Skills required: -1. 3D Modelling with CAD2. Knowledge of geometric dimension & tolerance.3. Knowledge of Jig fixture, Mould, die, related tooling.4. Analytical & Numerical skill
Job Description: -1. Utilize CAD Software to prepare product design & tooling design.2. Manage prototype as well as production ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
6.00 LPA TO 6.60 LPA
Job description
06.12.24
HPS/2024/760
Production Assambly
Male
1
3 to 8
DME/B.E Mech
JOB SUMMARY
A production assembly job involves assembling products, maintaining equipment, and ensuring quality standards are met. Here are some responsibilities of a production assembler:
Assembling: Assembling products with precision and care, using hand tools or machines
Inspecting: Inspecting products to ensure they meet specifications
Maintaining: Maintaining equipment and keeping the work area clean ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.40 LPA TO 3.00 LPA
Job description
13.05.24
HPS/2024/290
QC Executive (In Priting IPQC)
Male
1
3 to 4
B.Sc/DME/ITI Fitter
JOB SUMMARY -
Responsible for ensuring that our products meet the highest quality standards through testing,inspections & process improvements.
A company's methods for assessing product quality and, if necessary, improving it. There are various ways to perform quality control, including benchmarking, examining manufacturing procedures, ...
12 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.56 LPA TO 1.80 LPA
Job description
ITI Fitter/ITI Welder
Male
12
1 to 2
ITI Fitter/ITI Welder
Providing you the best range of Machine Shop Services, Quality Control Facility and Fabrication Shop with effective & timely delivery
We have urgent job openings for ITI Fitter / Turner / Welder /
Salary : 13000 to 15000
Job Location - Gujarat/Umbargaon
Role Fitter / Welder
Industry : in manufacture of ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.20 LPA TO 4.80 LPA
24.02.26
127172
HPS/2026/150
Enamelling Supervisor
Male
1
5 to 7
ITI/DME/B.E-Mech
8 Hrs
An Enamelling Supervisor oversees the production, coating, and finishing of metallic products (such as wires, strips, or components) with enamel, ensuring quality standards and safety compliance are met.
Key Responsibilities-
Production Oversight: Plan and manage shift-wise operations, including machine loading, die selection, and speed settings to maximize efficiency.
Quality Control: Ensure ...
3 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.28 LPA TO 2.40 LPA
JOB DESCRIPTION
15.12.25
122000
HPS/2025/647
Injection Mould-Production
Male
3
1 to 3
B.Sc/Diploma-CIPET
8 Hours
An Injection Mould-Production job involves operating, setting up, and maintaining plastic injection molding machines to mass-produce components, focusing on monitoring operations, performing quality checks (visual inspection, trimming), troubleshooting issues, documenting production data (cycle times, scrap), and performing basic maintenance (cleaning)
Key Responsibilities:-
Machine Operation: Set up, start, and run ...
1 Opening(s)
0 To 1.0 Year(s)
2.04 LPA TO 2.16 LPA
11.11.25
119856
HPS/2025/595
Clinching Press Operator
Male
1
0 to 1
12th
10 Hours + Canteen
Key responsibilities :-
Machine operation: Set up, operate, and maintain hydraulic or mechanical press machines according to specifications and safety guidelines.
Quality control: Monitor machine performance and inspect finished products to ensure they meet quality standards and specifications.
Setup and adjustment: Read blueprints or job orders to determine settings ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
2.16 LPA TO 2.40 LPA
11.11.25
119853
HPS/2025/593
Press Machine Operator
Male
1
1 to 2
ITI
10 Hours + Canteen
Key responsibilities :-
Setup:
Prepare presses by installing plates, adjusting settings, and loading materials like paper or other stock.
Operation:
Run the machines to produce materials, ensuring the process aligns with job specifications and safety regulations.
Quality control:
Monitor machine performance and inspect finished products for defects to ensure ...
1 Opening(s)
0 To 3.0 Year(s)
2.28 LPA TO 2.40 LPA
04.11.25
119424
HPS/2025/577
Liner operator
Male
1
0 to 3
10th/12th/ITI
12 Hours
Core responsibilities:-
Machine operation: Set up, run, and monitor production line equipment according to specifications and safety guidelines.
Quality control: Conduct regular quality checks on products to ensure they meet established standards and specifications.
Maintenance and troubleshooting: Perform routine maintenance and basic repairs on machinery to minimize downtime and address issues as ...